Orbit optimization and time delay interferometry for inclined ASTROD-GW formation with half-year precession-period |
Path length differences between two optical paths of the Relay- U (a), Beacon- P (b), and Monitor- E (c) TDI configurations for ASTROD-GW orbit formation with 1° inclination. |